Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

Ideas

Showing 14

Datalink: "Time Period" selection should be available in the front page

There are connectors which need to run monthly for multiple months due to changes in the previous periods. In order to load this in Apptio we need to either adjust manually each time the name of the file (with the month and year) or to go inside e...
over 2 years ago in Apptio / Data Connectivity (Datalink) 0 Future consideration

Datalink Connector List Export

The current connector list in DataLink only offers limited information. In order to see what tables connectors load into, source and destination time periods, and other details, you need to click into each connector. Attached is a mockup showing t...
over 2 years ago in Apptio / Data Connectivity (Datalink) 0 Future consideration

Disable/Delete Flow Interface not seen for X Months

Flow interfaces never get disabled or deleted once they are allowed for collection. Over time, interfaces move or are disabled thereby leaving these flow interfaces to consume licenses when nothing is being collected. There's no way to tell if a f...
3 months ago in SevOne / Dedicated NetFlow Collector (DNC) 5 Future consideration

Ability to delete files from Datadrop directly

At the moment we are unable to directly delete files from our DataDrop viewer and need to raise a support ticket. It would be great if this was an option for us to self-serve. Background of our issue: many files get copied into DataDrop each day...
over 2 years ago in Apptio / Data Connectivity (Datalink) 0 Future consideration

Collect, process & report Azure NSG/VNET flow logs

SevOne DNC already collects and process flows from different endpoints. With addition of Azure to this list will allow SevOne to be positioned uniquely for being single source of truth for both on-prem as well as Cloud networks.
almost 2 years ago in SevOne / Dedicated NetFlow Collector (DNC) 1 Future consideration

Create baselines based of netflow data

The specific ask from the customer is the ability to learn normal behaviour (and alert when there is an anomaly) of the IP flows going through the network (source IP, dest IP and application). This is a specific use case, but it would be great if ...
almost 2 years ago in SevOne / Dedicated NetFlow Collector (DNC) 0 Future consideration

Schedule Datalink connectors multiple times per week

Datalink should allow connectors to be scheduled multiple days per week.  Currently, I can only run once per week on the day that I choose, or every day.  For example, I have no way of running a connector every Sunday and Wednesday. ...
over 2 years ago in Apptio / Data Connectivity (Datalink) 0 Future consideration

Schedule DataLink connectors by working days

Many of our customers manage the upload of the files in based on the working days, for example actuals are available on the 6th working day of the month Datalink allows this to be done only based on days and not working days, which can be affected...
about 2 years ago in Apptio / Data Connectivity (Datalink) 0 Future consideration

CostAllocationRuleName to be added in Cloudabilty mapping for Datalink

CostAllocationRuleName field should be added to the Cloudability mapping for the cldy_monthly_azure Datalink connector. This field is included in the Usage Details Amortized and Actual Exports which is scheduled daily.
over 2 years ago in Apptio / Data Connectivity (Datalink) 0 Future consideration

Datalink Classic Cloudability connector -request for selecting dates for connection

Hello,  can you please add functionality to allow selection of the days of the month on which the connection should run? The request is for functionality that allows selection of the days on which the connection should run until the end of ti...
over 2 years ago in Apptio / Data Connectivity (Datalink) 0 Future consideration