Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Configure maintenance flyouts
User interface settings include the option “Show maintenance notes”. How can I as onprem-backend administrator configure and switch on such flyouts to inform my users about upcoming maintenance?

All ideas

Showing 4122

Show the SQL query on traces from CICS transactions to DB2/z

Shows a real E2E which includes the query at the end.
about 1 month ago in Instana / IBM Z / Tracing 0 Under review

Workload Automation - Databricks Plugin Improvements

IWA Databricks plugin should be improved in the visualization and interaction capabilities with the Databricks workflow: - Plugin should have the ability to view tasks (which are part of Databrick jobs) - Plugin should have the ability to rerun/co...
10 days ago in Workload Automation 0 Submitted

Turbonomic: Add support to install OVA on Nutanix Acropolis (not just target support)

As a customer, we need Turbonomic to support installations of on-prem Turbonomic servers, including SaaS components on Nutanix.Nutanix publishes a how-to for importing an OVA and running it. However this needs to be tested and supported by the pro...
about 1 month ago in IBM Turbonomic ARM / General/Other 15 Planned for future release

A status page for Turbonomic SaaS

Why is it useful? A dedicated SaaS status page for Turbonomic provides transparency to customers by delivering real-time updates on system performance, service availability, and ongoing incidents. This fosters trust and enhances the customer exper...
12 days ago in IBM Turbonomic ARM / SaaS 0 Under review

Define a group based on a tag

Customer wants to be able to create a scope/group based off a particular tag, and then assign a user to that group. To have RBAC based on tags.
4 days ago in Instana / Access Control 0 Submitted

The system importance needs to be idicated in the Infrastructure Map

In the infrastructure map, pillar hight is shown as the machine size (such as 4core small, 32core high)But for the operations of the systems, the machine size does not matter, but the business impact is important for us. Currently in the infrastru...
5 days ago in Instana / Infrastructure 0 Submitted

Plot data using variable as reference on Analytics

To make the charts (all or individual) plot data based on a variable (like POD for instance). This way, when a dashboard is created for a specific monitoring objective it would be easy to change the data by changing the variable the data is refere...
7 days ago in Instana / Application perspectives 1 Submitted

Allowing Scheduling of a Parking Schedule Pause

We have a need to plan/schedule Parking Schedule Pauses to allow developers/engineers to plan maintain windows into existing Parking Schedules. So currently we have parking schedules in place and our sysadmins can pause a parking schedule for a pe...
24 days ago in IBM Turbonomic ARM / General/Other 0 Future consideration

Ability to create an incident for the correlated group of events in alerts page.

When AIOps is already doing correlation and crating a reduced noise by grouping the alerts, why not able to create an incident for the same group and show the highest raking event in main incident summary.
6 days ago in IBM Cloud Pak for AIOps 0 Submitted

Collapsible bottom panel on Incident > Affected Resources tab

In an Incident, the Affected Resources tab has a bottom panel which is not collapsible and leaves very little room to examine the topology graph.
17 days ago in IBM Cloud Pak for AIOps 1 Under review