Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 4156 of 4156

TSA takeover by force sequence change request

TSA timeout occurred between DB2 servers (#1 Primary and #2 Secondary) , after this timeout #2 Secondary issued 'takeover by force' command to #1 Primary.Then, #2 became Primary and acknowledged #1 Primary was active (split brain) because the conn...
over 5 years ago in Tivoli System Automation 4 Not under consideration

Plan results shall include all commodities (e.g. IOPS) relevant for the resulting sizing

When running a plan, especially a hardware refresh plan, you cannot see the reasoning for the resulting number of hosts if the reason is a commodity like IOPS not displayed in the plan results. Therefore, please display all commodities (e.g. IOPS)...
6 months ago in IBM Turbonomic ARM / Planning 0 Future consideration

Use optman parameter for progressive switchplan instead of modify script

Hello, Currently, there is two options to manage stop agent progression in switchplan : conman stop @!/@/@ \; wait \; noaskconman stop @!/@/@ ; progressive This two lines are in switchplan script in IWS install directory, one is commented the othe...
6 months ago in Workload Automation 0 Future consideration

Add Support for Play Framework 3.0

We have upgraded to Play Framework 3.0 in our application and now the Instana monitoring no longer shows application metrics. We are aware that the supported Frameworks list only shows support up to Play 2.8: https://www.ibm.com/docs/en/instana-ob...
6 months ago in Instana / Java 0

In overlay windows such as action center the link to the entity on which homepage the overlay was opened does not work

In overlay windows such as action center the link to the entity on which homepage the overlay was opened does not work as it refers to the same URL. This is the case in all Turbo installations self-hosted and SaaS. Find attached a video outlining ...
6 months ago in IBM Turbonomic ARM / UI & User Experience 0 Planned for future release

Set workflows to run on all workers in a worker pool

It would be useful to be able to set a workflow to be executed on every worker in a worker pool, rather than round robin. This is useful for testing type scenarios when I'd want to run the same test from multiple endpoints and collate the results....
6 months ago in Rapid Network Automation 1 Functionality already exists

schedule alerts or events on certain days and times. For example: an event is executed only on Sunday from 7 am to 7 pm

Have the option to set the time period in which the alert or event should be executed (as an idea perhaps it is the opposite of maintenance windows)
6 months ago in Instana / Alert 1 Not under consideration

Prevent RESUBMIT job stream plug-in job type to submit same stream multiple times within same minute

We have recently experienced some mailbox.msg corruption issues which are documented under case #TS014467118.It was identified by HCL that the corruption is caused by the resubmit plug-in job type and occurs in memory.We really identified many RES...
12 months ago in Workload Automation 0 Future consideration

HA DI Server (Just like a HSA vPAS or HSA DNC)

As of right now the DI server is a standalone server. If it was HA configurable it would follow the other SevOne products of having a "hot Standby Appliance" ready to go in the event of a failure and or have the ability to support a VIP IP. Just s...
12 months ago in SevOne / Configuration and Administration 0 Planned for future release

SNMPv3 Engine ID changes

Incorporate the SNMPv3 engine id CHANGE natively within the product
over 1 year ago in IBM Cloud Pak for AIOps 0 Future consideration