Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Configure maintenance flyouts
User interface settings include the option “Show maintenance notes”. How can I as onprem-backend administrator configure and switch on such flyouts to inform my users about upcoming maintenance?

All ideas

Showing 1429

We need a force option added to wappman

We are thinking about working with wappman to move our workload to the higher environments. After some testing and figuring out how we can incorporate it into our current way of working, we notice we are missing a "force" option to bypass the warn...
over 1 year ago in Workload Automation 0 Future consideration

Workload Designer: ability to change the displayed order of Jobs within Job Streams

Currently when adding new jobs to a job stream they end up at the end of the list regardless of where the job goes dependecy-wise. But the job stream can be more clear to read if the job is placed according to its dependencies. This is a request t...
over 9 years ago in Workload Automation 2 Future consideration

Plugin for MSSQL Jobs - add the possibility to restart from step

The request is to add an optional parameter "step" in the MSSQL job. When such a parameter is set the job is launched (or re-launched) not from the beginning but from the specified step.The step could be specified either by its numeric id, or by n...
over 4 years ago in Workload Automation 0 Future consideration

The Ansible Job Output is missing from Services

The Ansible Job Output is missing from Ansible Tower backed Services. (ServiceAnsibleTower). In previous versions, the output of the Ansible Tower Job would display in in Services -> My Services -> <service name>. This no longer the ca...
over 1 year ago in IBM Cloud Pak for AIOps 0 Future consideration

Miss page_sets parameters in Instana thresholds

Dear colleagues, our customer monitors MQ pages (percentiles and total) with Tivoli Monitoring. They seek for transition to Instana, so they're interested in implementation of analogs to what they use in ITM. Below is the example of such ITM situa...
over 1 year ago in Instana / MQ / Sensor 0 Future consideration

Need way to specify resource filtering for Built-In events

Dear colleagues, In Instana can monitor events using built-in capability for example "IBM MQ event - Channel SSL Error" or "IBM MQ Channel status". Our customer monitors it with Tivoli Monitoring. They seek for transition to Instana, so they're in...
over 1 year ago in Instana / Common / Sensor 0 Future consideration

We are interested in NFM-P probe for NSP 21.3

Customers are upgrading to NSP 21.3 for better features and security. A certified probe is required for the same.
about 3 years ago in IBM Cloud Pak for AIOps 1 Future consideration

Under Infrastructure the IBM ACE Message Flow view shows the Flow Nodes associated with the Messageflow and has a single Maximum Elapsed Time for each node; we would also like an Average Elapsed Time for each Flow node as well.

As stated above, displaying the Average Elapsed Time for each message flow node for the selected timeframe would provide a great deal of value when using Instana to track Message Flow performance. As a 2nd ask, and of lesser priority, would it als...
over 1 year ago in Instana / ACE/IIB / Sensor 0 Future consideration

Allow calendars to use specified times along with dates.

We have Extended outage on specific dates though out the year. starting at 11:00 PM on Saturday and ending at 05:30 AM Sunday. Our extended outage calendar works but no jobs run for the whole day Saturday and Sunday. It would be great to have this...
over 1 year ago in Workload Automation 0 Future consideration

Instana Support for z/VSE Operating System

This is a request for IBM to support running Instana the mainframe z/VSE operating system similar to the way it is currently supported on z/OS operating system (with Instana Gateway, CDP Streaming, spans, etc.). It would be useful to the many IBM ...
over 1 year ago in Instana / IBM Z / Sensor 0 Future consideration