Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Configure maintenance flyouts
User interface settings include the option “Show maintenance notes”. How can I as onprem-backend administrator configure and switch on such flyouts to inform my users about upcoming maintenance?

All ideas

Showing 4269

Add Proxy support for FTP Monitoring with KIS Agent in ITCAM for Transactions

We are using ISM Agent (KIS) in Version 07.40.02.03 to monitor several protocols like HTTP, HTTPS, LDAP We would start with FTP monitoring, but in our company ftp connections are restricted to connect over a give ftp proxy. I was really surprised ...
over 3 years ago in ITM/IBM APM 1 Future consideration

Method for dealing with Webhook Calls to Endpoints that are Throttled (HTTP 429)

When using webhooks from Turbonomic, some of the endpoints we can call are throttled. Because of this, when we make multiple calls at scale, many of our calls will receive a 429 and fail. For example, AWS Lambda functions only allow 10 API calls p...
over 1 year ago in IBM Turbonomic ARM / APIs 0 Future consideration

Allow choose direction of action for Container Platform Plans

If you plan a Container Platform Cluster optimization, it only permit choose scale or not. If it's possible to pick just resize down container spec and/or resize up, users will know the difference between actions. This is aligned with: https://ide...
8 months ago in IBM Turbonomic ARM / Container Platforms (K8s & OpenShift) 1 Future consideration

Variable drop down at the top of a report should be assignable to effect specific widgets or all but a specific widget on the report.

Functionality exists in competing product Grafana, which GTS is trying to migrate from to SevOne-Data Insight. Customer needs the variable drop downs on a report to effect all sections but then when a second variable drop down is selected that sec...
8 months ago in SevOne / Data Insight (DI) 0 Future consideration

Needs to add Cluster Storage Drive Data in Instana

Team, our Dell S2D platform Cluster Storage information is not reported in Instana portal. Instana only reporting the specific Node native drives but not the cluster volumes.
over 1 year ago in Instana / Infrastructure / Sensor 0 Future consideration

Dash Board Assistance Required

Assistance required for Centralized Dash Board across multiple applications.
almost 4 years ago in Workload Automation 7 Not under consideration

Fix colours on the pie chart report.

The idea is to be able to assign the color to the particular value of the pie chart and fix it there. Currently, if the value has a particular color but then will be hidden by the filter, the color is re-assigned to a different value, which chang...
over 1 year ago in Targetprocess / Reports 0 Future consideration

Spend limit alert

When users introduce data in Planning, they are asking for an alert so that they don't exceed their budget. If for that cost line they can spend 1000 but in January 2024 they have written 1100, there should be some sort of alert. Same if they put ...
8 months ago in Apptio / Apptio Planning 0 Future consideration

Burn chart chart created through Dashboard widget doesn't filter based on custom quick filter

When the user creates a report with Burn down chart in a dashboard.We do not have option to add a custom quick filter.
8 months ago in Targetprocess / Reports 0 Under review

Support configurable duration for DFA and RSD Slope-based Policy Conditions

The current fixed duration for DFA and RSD is too short to include Triggering on longer persistent behavior, like low Slope (e.g., flatlining when not at 0% or 100% utilization) Supporting up to the standard 2-hour duration setting would improve t...
8 months ago in SevOne / Network Management System (NMS) 0 Future consideration