Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

Ideas

Showing 22

ENCRYPTED PASSWORD SECURITY IN DB2 METRICS MONITORING

We were trying to setup remote DB2 monitoring, however connection is failing. Our DB2 admin told us, he is using options securityMechanism=7;encryptionAlgorithm=2 when connecting to that DB2 using jdbc. By my understanding that really means User I...
12 months ago in Instana / DB2 1 Future consideration

Datalink: "Time Period" selection should be available in the front page

There are connectors which need to run monthly for multiple months due to changes in the previous periods. In order to load this in Apptio we need to either adjust manually each time the name of the file (with the month and year) or to go inside e...
over 2 years ago in Apptio / Data Connectivity (Datalink) 0 Future consideration

DB2 - HADR_FLAGS metric to be Monitored and Alerted

Hi Team!According to Instana documentation, sounds "HADR_FLAGS" metric is not collected, correct ?So when a tablespaces is invalid or error state on the Standby database, the HADR_FLAGS field will displaythe value STANDBY_TABLESPACE_ERROR. Monitor...
about 2 years ago in Instana / DB2 / Sensor 1 Future consideration

To be able to support DB2Connect

Get metrics (and traces if possible) from DB2Connect.
7 months ago in Instana / DB2 1 Future consideration

Datalink Connector List Export

The current connector list in DataLink only offers limited information. In order to see what tables connectors load into, source and destination time periods, and other details, you need to click into each connector. Attached is a mockup showing t...
over 2 years ago in Apptio / Data Connectivity (Datalink) 0 Future consideration

Ability to delete files from Datadrop directly

At the moment we are unable to directly delete files from our DataDrop viewer and need to raise a support ticket. It would be great if this was an option for us to self-serve. Background of our issue: many files get copied into DataDrop each day...
over 2 years ago in Apptio / Data Connectivity (Datalink) 0 Future consideration

Schedule Datalink connectors multiple times per week

Datalink should allow connectors to be scheduled multiple days per week.  Currently, I can only run once per week on the day that I choose, or every day.  For example, I have no way of running a connector every Sunday and Wednesday. ...
over 2 years ago in Apptio / Data Connectivity (Datalink) 0 Future consideration

Schedule DataLink connectors by working days

Many of our customers manage the upload of the files in based on the working days, for example actuals are available on the 6th working day of the month Datalink allows this to be done only based on days and not working days, which can be affected...
over 2 years ago in Apptio / Data Connectivity (Datalink) 0 Future consideration

CostAllocationRuleName to be added in Cloudabilty mapping for Datalink

CostAllocationRuleName field should be added to the Cloudability mapping for the cldy_monthly_azure Datalink connector. This field is included in the Usage Details Amortized and Actual Exports which is scheduled daily.
over 2 years ago in Apptio / Data Connectivity (Datalink) 0 Future consideration

Support InfoSphere DataStage metrics for Instana Agent

We have a system where InfoSphere DataStage is main component. In this system, we take a long time and cost to collect metrics and evaluate it. Please support the InfoSphere DataStage metrics for Instana Agent. Our InfoSphere DataStage is 11.7.0, ...
6 months ago in Instana / DB2 1 Future consideration