Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 3611

Automatic use of certificate for Infrastructure management

When accessing Infrastructure management, a self-signed certificate is currently used. Infrastructure automation appears to discovery a certificate from the OpenShift cluster and works well, but Infrastructure management reports a the site as "not...
5 months ago in Infrastructure Automation 0 Under review

User onboarding dialog requires selecting preferred timezone which is limited/outdated. Provide a means to customize.

We have customers in a wide variety of geos and tailoring to their needs is necessary and useful.
3 months ago in SevOne / Network Management System (NMS) 1 Functionality already exists

Azure Sql Db scaling shouldn't only consider DTUS but also IOPS

This customer has an application which is very sensitive to IOPS. They specifically chose Premium Tier DTU , as it has MUCH more IOPS. >25 IOPS per DTU vs 1-4 IOPS per DTU. So when Turbonomic sees the DTU usage (which is a combination of CPU/ME...
about 1 year ago in IBM Turbonomic ARM / APM & Applications & Databases 1 Future consideration

Allow insert limit in Park override

Today if a user override a parket VM, they can choose between a end date or a number of hours. But someone with bad intentions can override for 1 year or 999 hours for instance. The admin should have a way to put limit on each override, like 2 hou...
about 2 months ago in IBM Turbonomic ARM / UI & User Experience 0 Future consideration

Smart Alert - grouping/summary/templates

A function of other APMs that I've used is the concepts of summaries and group alert copy or alert templates. Summaries - In cases, when memory, CPU and or filesystems alert they do so together which is a single event. With a summary structure, wh...
about 2 months ago in Instana / Infrastructure 1 Functionality already exists

Smart alerts should have a severity placeholder

With build " 1.282.1064" the smart alerts got a very useful ability to have warning and critical thresholds defined on a single smart alert. This was a welcomed change and reduce our planned alert set by half. However, we were also expecting to be...
about 2 months ago in Instana / Infrastructure 1

Expansions of Infrastructure Smart Alerts

Decouple the smart alert title with the subject of the resulting email. Currently with the title and subject line being the same, the display for smart alerts shows the placeholders which have no real meaning in the context of smart alert listings.
about 2 months ago in Instana / Infrastructure 2 Functionality already exists

Insana Alerting - JS errors based on error rate while using multiple filter conditions

We are trying to do alerting for JS errors based on error rate as the metric is available within alerting scope, but it's not working as expected. When applying different filter expressions within our JS alerting scope, the error rate metric isn't...
about 2 months ago in Instana / Alert 1 Needs more information

We need the Event for ACE Integration Node offline and should be able to generate separate Alerts for PROD and NON-PROD.

We tried with SystemRule "Offline Event Detection" and Dynamic Focus Query "entity.selfType: IntegrationNode". This is generating Event/Alert when any of the Integration Nodes is down. But we are looking for separate Event/Alert for PROD and NON-P...
3 months ago in Instana / Sensor 0 Submitted

Synthetic Alerts

Alerts that are defined within SevOne are restricted to the trigger conditions within that policy. The idea here is to be able to define synthetic alerts based on the presence or count of another alert (or multiple). The main requirement is for al...
3 months ago in SevOne / Network Management System (NMS) 1 Future consideration