Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Configure maintenance flyouts
User interface settings include the option “Show maintenance notes”. How can I as onprem-backend administrator configure and switch on such flyouts to inform my users about upcoming maintenance?

All ideas

Showing 4141

Search in EventViewer - CNEA

When searching for a device in EventViewer - IBM_Cloud_Analytics, it should display the entire grouping for which it is part of + individual alarms (Individual_Alarm.png + CEACorrelationDetail_Group.PNG). Currently it displays it, only if it is si...
10 months ago in IBM Cloud Pak for AIOps 0 Future consideration

Data Insight needs added functionality so that when a widget is taking and excessively long time to load and thus delaying the rest of the report to complete, the UI should present function to the user to halt that specific widget

User notes this function already exists in Grafana, added function would all Customer to determine problems with Report loading when they are building reports. Issue manifest most notably when building reports in their staging environment are move...
about 1 year ago in SevOne / Data Insight (DI) 0 Future consideration

Ability to export logging of all configuration changes for a period of at least 12 months

To avoid a deficiency from the IT audit we would need to have a logging of all configuration changes for a period of at least 12 months and preferred for 15 months.
10 months ago in Targetprocess / User Experience 0 Under review

The VMware Target should have the check box just like the Dynatrace Target (Collect Tag Information)

Right now if the same tag comes in from VMware and the APM target you're going to get duplication. Let the customer decide if they want the duplication. I recommend that the default value is YES. The other option is to have smart logic choosing wh...
about 1 year ago in IBM Turbonomic ARM / On-Premises (Hypervisor & Storage & Network) 3 Not under consideration

Notifications of Build Completions

It would be nice to have an option to select a specific build and be notified (email) when the Staging calculation is completed instead of logging back into TBM Studio and check status.
over 1 year ago in Apptio / TBM Studio - Data/Model Studio 0 Future consideration

Configuration at menu of the TEP console that allow to change the font size of the menu

Hi There could be an option in the configuration menu of the TEP(Tivoli Enterprise Portal) to increase the font size of the menus of the TEP. Thanks.
5 months ago in ITM/IBM APM 1 Future consideration

Application component actions don't have enough information

If you check the application component pending actions (heap resize) and extract the list to a spreadsheet or print the screen, there's nothing to separate for each area. There's no column for Account or Container cluster as example. In this case,...
5 months ago in IBM Turbonomic ARM / UI & User Experience 0 Future consideration

Bring your own database

Resiliency is top of mind when maintaining a critical system such as Cloud pak for AIOps. Many enterprises have existing databases available to be used with existing approved backup/restore plans. If enterprises could bring their own database that...
5 months ago in AIOps Integrations 0 Under review

Instana should allow to raise Events -> Alerts based upon log messages

Instana currently relies on metrics to create Events which can raise Alerts. Applications often have some known error codes or messages which refer to specific issues that may not be immediately evident by some of the metrics collected by the solu...
about 1 year ago in Instana / Alert / Logging 0 Future consideration

Add business metrics to Instana traces for IIB and ACE

The current implementation of both IBM Integration Bus (IIB) and App Connect Enterprise (ACE) could emit business metrics through monitoring events which are published through MQ topics. A similar implementation with the connection through OpenTel...
about 1 year ago in Instana / ACE/IIB 1 Future consideration