Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

FILTER BY CATEGORY

Workload Automation

Showing 396 of 2469

just retain the name of original schedule in the schedule userjobs

If the schedule is not in carryfroward, its diffciult to retrieve original schedule in the userjobs schedule
7 months ago in Workload Automation 0 Future consideration

twsinst efficiency improvements

Ref: TS011706916 We've noted when upgrading from 9.4 to 9.5, and also when applying fixpacks to 9.5, that twsinst is performing "copy" operations on all the files in the stdlist directory instead of "move" operations. This has led to two issues du...
7 months ago in Workload Automation 0 Under review

Simplify ACL/SDOM management with IWS >9.5

Hello, Currently we use SDOM structure to limit our applicative manager to their application and to force norm usage. For exemple - For Job name: 3 characters for application code (CCX) 1 character for job type (one of these 3 letters XTM) 1 chara...
7 months ago in Workload Automation 7 Needs more information

A new field for occurences with the original ADID

Workload (dynamic and static) increases rapidly and the end of the CP planning period got hit regularly. To avoid this issue some woradounds are needed and already supported by PIF. PIF (e.g. WAPL) can create an alias occurence ids. However, the o...
7 months ago in Workload Automation 0 Future consideration

Extending the accuracy of the input arrival date time

Workload (dynamic and static) increases rapidly and the end of the CP planning period got hit regularly. To avaid complicated workarounds, the input arrival date time needs a better accuracy - at least to seconds. By increasiny the accuracy of the...
7 months ago in Workload Automation 0 Future consideration

EQQSERVER avoid 878 abend by limiting connections

The EQQSERVER uses memory under 16 MB. If many jobs use the EQQSERVER, we get an S878. To avoid downtime, the number of concurrent connections must be limited. The server task should reject or queue new incoming connections (e.g. a FIFO queue). To...
7 months ago in Workload Automation 4 Future consideration

installation improvement for LDAP

Today we solved the ldap authentication problem. It was due to a conflict of two users with the same username in two different user repositories: basic and LDAP. Since there is no more a local user repository in Liberty a copy of your real install...
7 months ago in Workload Automation 0 Under review

DWC - Viewing external dependency graphically from workload designer

It would be useful if the workload designer could show external dependencies between multiple chained jobstreams, to allow a better understanding of the scheduling network. Currently the designer only shows immediate predecessors for jobstreams. E...
7 months ago in Workload Automation 1 Future consideration

In DWC, Provide Excel kind of filter option in monitor workload field results, add exclusion option in monitor workload --> Object type job --> Edit option , Enable dragging option in the monitor workload results to take action on bulk job instances

We need below features in DWC future release, Provide Excel kind of filter option in monitor workload field results. For example, in excel sheet using filter option, we can select or unselect the entries based on our requirement. Actually, we are ...
7 months ago in Workload Automation 0 Future consideration

TWS Obsolete Jobs Removal

Hello Team, We are looking for removal TWS Obsolete Jobs from the Symphony Plan. We have observed that there jobs which are 6 months older are being carry forwarded daily in the next day Plan. This is causing load on the FINAL stream. I have updat...
7 months ago in Workload Automation 0 Under review