Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Configure maintenance flyouts
User interface settings include the option “Show maintenance notes”. How can I as onprem-backend administrator configure and switch on such flyouts to inform my users about upcoming maintenance?

All ideas

Showing 3659

Smart alerts should have a severity placeholder

With build " 1.282.1064" the smart alerts got a very useful ability to have warning and critical thresholds defined on a single smart alert. This was a welcomed change and reduce our planned alert set by half. However, we were also expecting to be...
2 months ago in Instana / Infrastructure 1

Expansions of Infrastructure Smart Alerts

Decouple the smart alert title with the subject of the resulting email. Currently with the title and subject line being the same, the display for smart alerts shows the placeholders which have no real meaning in the context of smart alert listings.
2 months ago in Instana / Infrastructure 2 Functionality already exists

Insana Alerting - JS errors based on error rate while using multiple filter conditions

We are trying to do alerting for JS errors based on error rate as the metric is available within alerting scope, but it's not working as expected. When applying different filter expressions within our JS alerting scope, the error rate metric isn't...
2 months ago in Instana / Alert 1 Needs more information

Both the v2 and v3 API's require customer facing documentation that covers the rate limits for the various endpoints contained where in.

Information such a rate limits for updates to API is a critical oversight in the SevOne published documentation. Customer uses api for a significant portion of SevOne functionality for large updates e.g. device adds, interface description updates ...
4 months ago in SevOne / Network Management System (NMS) 2 Is a defect

keep infrastructure metric history on activation of beeInstana

Please refere to TS015999019 Missing his torical Data after migration to beeinstana
4 months ago in Instana / Enterprise Applications 0 Future consideration

Place event id in alert header

Currently there is no id in email alert header. Please make e.g. event id part of email alert header to support automated and human processing
4 months ago in Instana / Alert 0 Under review

Large resource statuses to load a small subset of status event and allow user to page between them to improve performance. So if a resource has more than 30 (user configurable) statuses against it, it would load the first 30 and provide an option to page between additional pages containing the next 30 etc.

Currently if a resource has lots of statuses against them then opening the status view can sit there for ages before loading or giving up and throwing an error. By limiting the number shown and allowing the user to step through additional status r...
8 months ago in IBM Cloud Pak for AIOps 0 Under review

Provision to export the topology Data into Excel from Topology Viewer page.

Topology Viewer ASM page has options to export the topology to PNG, SVG Format. Need an option to export the topology to Excel.
9 months ago in IBM Cloud Pak for AIOps 0 Planned for future release

Parking runs into problems when VMs are too close to the Quota Limit

Business Case: Customer shut down 5 Azure VMs - and tried to turn them on in the morning - only 4 did- because the quota for that VM was exhausted. The Customer had to half the size of the machine - then it could start up. What would be REALLY goo...
2 months ago in IBM Turbonomic ARM / Public Cloud IaaS 1 Under review

Parking should have better notification. More than just an error message in the Executed actions widget

The customer is using Parking to suspend and bring up scores of machines. They need to know quickly and easily if machines are NOT suspending and/or starting up. Can we get notifications displayed in the Parking Modules. This will make it easier f...
2 months ago in IBM Turbonomic ARM / Public Cloud IaaS 2 Future consideration