Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

Ideas

Showing 43

Need an option to increase polling interval for built-in events such as Ping which we are monitoring using synthetic check.

Need an option to increase polling interval for built-in events such as Ping which we are monitoring using synthetic check.
8 months ago in Instana / IBM i 2 Under review

The idea is to restrict users from accessing a branch.

More specifically, users can only access the branch assigned by the admin. For example, Employee A can only work in Branch A and cannot access Branch B or C.
8 months ago in Apptio / Other 0 Submitted

Events should not be closed automatically until the issue gets resolved

The events are getting auto-closed in Instana for all the metrics such as Jobs, CPU, etc. We want the event to be closed only if the issue is resolved in the next poll.
9 months ago in Instana / IBM i 4 Not under consideration

AS400 Message queue alert to be triggered based on specific requirements

We have requirement to monitor the alerts for AS400 message queue based below scenarios: 1. If the message type is (DIAGNOSTIC/INQUIRY/INFORMATIONAL, etc.) and the severity is (>=, <=, or =).2. If the message type is (DIAGNOSTIC/INQUIRY/INFO...
9 months ago in Instana / IBM i 1 Future consideration

Support for PHP Sensor on native IBM i agent.

Any customer using PHP on IBM i would likely benefit from having support for this service.
9 months ago in Instana / IBM i / PHP / Tracing 1 Future consideration

Warning Message for +5m rows in cldy_monthly_aws and cldy_monthly_azure

Hi, It would be great to include a warning message for big cloud bill loads into A1, to advise things to check to slim down this dataset. So for example: Resource Level information should not be includedUsage Date should not be includedItem Descri...
over 2 years ago in Apptio / Other / TBM Studio - Data/Model Studio 0 Planned for future release

Change the message description for Built-In event to show in understandable format

As of now we are getting multiple information Instana in Built-In event such as message , subsystem & job monitoring. The raw information such as description of the event is passed as it is to the ticketing tool in which it's showing the data ...
6 months ago in Instana / IBM i 2 Future consideration

Add an option to change the severity of a built-in events

We need an option to change the severity of a built-in event as per the requirement from the customer. As of now it's fixed, therefore Priority events are getting missed because those are set as warning. For example, message queue, Top active jobs...
6 months ago in Instana / IBM i 1 Not under consideration

Real time cpu, ASP and disk utilization should be captured in event description.

Real time cpu, ASP and disk utilization should be captured in event description. For example threshold is configured for generate the event if utilization is more than 80% then what was exact utilization that time (like 81%, 83% or 87% etc)
8 months ago in Instana / IBM i 1 Not under consideration

Allow Custom Report Collections in Vendor Insights

We are building some custom reports in the Vendor Insights Project, that need to be added as new Report Collections in Vendor Insights. Currently, Vendor Insights project doesn't allow us to create/add custom named Report Collections to it. It wil...
over 2 years ago in Apptio / Other 0 Submitted