Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Configure maintenance flyouts
User interface settings include the option “Show maintenance notes”. How can I as onprem-backend administrator configure and switch on such flyouts to inform my users about upcoming maintenance?

All ideas

Showing 4262

Restrict addition of Percentage columns in Apptio -Non-summable

We have an option to restrict row totals in Apptio for any field (By selecting Summable/Non-summable option in the formula ). But the same option is not working fine when the column total is happening. Percentage values cannot be summable, the cal...
about 1 year ago in Apptio / TBM Studio - Data/Model Studio 0 Under review

User onboarding dialog requires selecting preferred timezone which is limited/outdated. Provide a means to customize.

We have customers in a wide variety of geos and tailoring to their needs is necessary and useful.
6 months ago in SevOne / Network Management System (NMS) 1 Functionality already exists

No tags for empty vm specs

When we export App service plan Delete actions, We noticed that tags not appear, they're not there and would love to see them included. They only appear to be missing in Delete actions for VM spec.
11 months ago in IBM Turbonomic ARM / Reporting 0 Not under consideration

we want to see the application pools as individuals applications

we dont want to see application pools, because we cannot make dashboards of the ones that are inside the application pool.
over 1 year ago in Instana / .NET 1 Not under consideration

Automating zero-value row removal to enhance efficiency & accuracy in forecast & budget plans in ITP

Requesting an enhancement to IT Planning (ITP) to improve efficiency and accuracy by automating the removal of zero-value rows from annual forecast plans and budget plans. The current manual process, conducted twice per year, presents opportunitie...
12 months ago in Apptio / Apptio Planning 0 Future consideration

User-friendly feature needed: GUI-based preexisting setup/config clone to create new

AS-IS: each new custom setup (incl. observer job config, policy, etc.) we have to manual enter all para one by one. Desired TO-BE: ================= Target use case (NOT limit to, but same principle cross over): #1. Define > Integration (Incl. ...
3 months ago in IBM Cloud Pak for AIOps 0 Under review

Customer wants a more sophisticated Turbonomic system status page

The customer is concerned with hard outages and soft (data) outages. Wants to see this on one page. - like apple or datadog platform status page. Can we pull the details of the current System Health and System Alert pages into one cohesive page. A...
6 months ago in IBM Turbonomic ARM / General/Other / SaaS 2 Future consideration

We need the Event for ACE Integration Node offline and should be able to generate separate Alerts for PROD and NON-PROD.

We tried with SystemRule "Offline Event Detection" and Dynamic Focus Query "entity.selfType: IntegrationNode". This is generating Event/Alert when any of the Integration Nodes is down. But we are looking for separate Event/Alert for PROD and NON-P...
6 months ago in Instana / Sensor 0 Submitted

Synthetic Alerts

Alerts that are defined within SevOne are restricted to the trigger conditions within that policy. The idea here is to be able to define synthetic alerts based on the presence or count of another alert (or multiple). The main requirement is for al...
6 months ago in SevOne / Network Management System (NMS) 1 Future consideration

Option to Export as a .CSV out of TBM Studio

As an admin, I export data directly out of TBM Studio for our users to review and upload themselves into IT Planning. As the default file type when exporting out of TBM Studio is .xslx and the required file type to import into IT Planning is .csv,...
almost 2 years ago in Apptio / TBM Studio - Data/Model Studio 0 Future consideration