Skip to Main Content
Cloud Management and AIOps
Hide about this portal


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Configure maintenance flyouts
User interface settings include the option “Show maintenance notes”. How can I as onprem-backend administrator configure and switch on such flyouts to inform my users about upcoming maintenance?

All ideas

Showing 5433 of 5433

Give the possibility to copy/duplicate several budget lines in one action

Currently, we can only duplicate one line. Goal is to be able to copy/duplicate several lines in one action. Maybe possible to implement it with the new view thanks to the CheckBox selection present at each line ?
7 months ago in Apptio / Apptio Planning 0 Planned for future release

Possibility to create report on the "Report Collection" table

Give the possibility to create a report allowing to have the information stored in the "Report Collection" Goal should be to obtain easily wat are the selected role assigned to a collection but also the report assigned to it. This will be more eff...
7 months ago in Apptio / TBM Studio - Report Studio 1 Needs more information

Alert Group Naming

Rather than use the summary of one of the grouped alerts allow the organization to use a combination of alert properties, resource name, highest priority for the group name. Adjust group priority dynamically based on the highest alert property.
7 months ago in IBM Cloud Pak for AIOps 1 Future consideration

Impact MWM entries export and import option

We are looking for an option to export the all MM entries from GUI. Also, if we have bulk MM entries to add, we are looking for option to add MM entries using excel file import or any such option.
7 months ago in IBM Cloud Pak for AIOps 0 Needs more information

We can see the interfaces and their IP in object summary. These IP's are ipv4 need ipv6 aswell.

The SNMP walk file was able to find the IPv6 address for the interface object "GigabitEthernet0/4/0/19.1202". The OID for IPv6 is "'.1.3.6.1.2.1.4.34.1.3.2'".IP-MIB::ipAddressIfIndex.ipv6."24:00:52:00:a0:00:00:00:00:00:00:0d:04:00:0d:b9" = INTEGER...
7 months ago in SevOne / Network Management System (NMS) 0 Future consideration

Retrieve multiple alerts AlertID values stored in a single variable when executing a right click tool

In the alert view, it is possible to select multiple alerts and execute a Right-Click tool. The expected result is that the tool returns the AlertID for all selected alerts, however it only returns one. This behaviour can be used in many scenarios...
7 months ago in IBM Cloud Pak for AIOps 0 Future consideration

Missing node/component should be expressed for a longer term in the infrastructure map for traditional systems

In the infrastructure map, when the node or component is down ( metric is not sent to the backend ), that node/component is not displayed in the Infrastructure map anymore. This is a good design for cloud native systems, each container lifecycle i...
7 months ago in Instana / Alert 2 Functionality already exists

The system importance needs to be idicated in the Infrastructure Map

In the infrastructure map, pillar hight is shown as the machine size (such as 4core small, 32core high)But for the operations of the systems, the machine size does not matter, but the business impact is important for us. Currently in the infrastru...
7 months ago in Instana / Infrastructure 3 Future consideration

Enable Filter Dependency Option with Projects & Teams & Custom Quick Filters

Currently the filter dependency option does not work based on the project and team context filers. The teams filter should depend on the selection for project and other custom fields, particularly Agile Release Train. If I select my project and/or...
7 months ago in Targetprocess / Filters 0 Future consideration

New device support for ITNM Collector for Ericsson ENM EMS as tracked in case TS017711078

5G Core devices like UPF/SMF/AMF/NSSF/NRF are currently not recognized by the ITNM Collector for Ericsson ENM and thus doesn't have the support to process Discovery for these device types. Please confer with kmkodali@us.ibm.com.
7 months ago in Tivoli Network Manager 0 Planned for future release