Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Configure maintenance flyouts
User interface settings include the option “Show maintenance notes”. How can I as onprem-backend administrator configure and switch on such flyouts to inform my users about upcoming maintenance?

All ideas

Showing 3551

Additional options for column colouring in Widgets

Currently in Data Insight when setting up Performance metrics, you can use custom color ranges to highlight different rows based on the values in 1 column, however when using multiple indicators there are times when multiple columns may be importa...
over 1 year ago in SevOne / Data Insight (DI) 2 Future consideration

Policy Historical Helper: In the policy editor, add a feature that will help determine if the policy has the correct settings by using historical data.

It would help admins determine if the new policy or policy changes will catch the expected events. Otherwise, users would have to wait for future events to see if the policy had the desired results. In a separate tab in the Policy Editor, display ...
8 months ago in SevOne / Configuration and Administration 0 Planned for future release

Variable Capabilitiy for Instana's Grafana Plugin

The Instana plugin for Grafana needs support for variables to be used in dashboards and queries. Without this, a Grafana dashboard that displays Instana data must use hard coded server names in the queries. Thus, to show the same graph for a diffe...
8 months ago in Instana / Backend Enablement 1 Not under consideration

Instana email notification does not include status and other important fields for alert condition

Client has reported that the email content does not include alert payload e.g. threshold, metric, status. Lack of status field does not let client effectively use email notifications for additional processing of the event. Request is to add all al...
8 months ago in Instana / Alert 1 Functionality already exists

When DataType detects a DB Type change should show a sign e.g. an exclamation point to indicate the required D.T. refresh

When DataType detects a DB Type change and updates the data in DataType (for instance from Oracle NUM16 to NUMBER) and data in the DataType changed from Integer to Float, it should show an exclamation point to indicate that DataType has detected D...
over 5 years ago in IBM Cloud Pak for AIOps 0 Future consideration

Instana tracing support for monitoring Dynamics AX 2012 ERP

Performance monitor our Dynamics AX 2012 R3 solution, which are our ERP system, and primary data accumulator. We want a special focus on SQL performance. The software running our Dynamics AX solutions is: Dynamics AX AOS server (.net application),...
8 months ago in Instana / .NET / Sensor 1 Not under consideration

Icons on left go missing when GUI is in large font/size

When a new user logs into Turbo, their GUI by default shows the screen as fairly large and the icons on the black bar on the left of the GUI are not always present (first to go missing is Settings at the bottom). If you resize the screen to be sma...
over 1 year ago in IBM Turbonomic ARM / UI & User Experience 0

Pure Storage Data Reduction Ratios not being picked up by Turbo. Using the manual Over-provisioning %. Therefore Turbo makes unnecessary Provision Disk Array Recommendations

The customer says Turbo's AI should be picking up data that is available in the PURE Storage system - and should not be requiring that the Storage Capacity Planners be adjusting the Storage Overprovisioned Percentage in the Disk Array Policy. I wi...
almost 2 years ago in IBM Turbonomic ARM / On-Premises (Hypervisor & Storage & Network) 0 Future consideration

Allow Mailman Server to continue processing other servers after a failed server

Please refer to We have 20 servers under the control of a single Mailman server , Which processes the message queue. We had a failure on 1 server , which in turn caused ALL other server messages NOT to be processed. which eventually IWS believed t...
almost 2 years ago in Workload Automation 0 Future consideration

Time data needed at the call details panel

It is not easy to know the starting time and the latency for calls, when the timeline is not shown in the analyzer, i.e., for big traces. My proposal is to show, in the call details panel, at what time the call started and which was its latency. T...
almost 2 years ago in Instana / Application perspectives 0 Future consideration