Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Configure maintenance flyouts
User interface settings include the option “Show maintenance notes”. How can I as onprem-backend administrator configure and switch on such flyouts to inform my users about upcoming maintenance?

Instana

Showing 1184

It's better to have the percent memory utilized for a process (e.g., Integration Server process in IBM ACE)

We want to capture the percentage memory utilized for any integration server process. This will help in identifying the max. memory used process so that support team can take appropriate action on that process.
4 months ago in Instana / ACE/IIB / Sensor 2 Future consideration

make rate of two custom events alertable

Currently we are able to create eg. smart alerts on a metrik over custom range of http between codes >= 400 and <= 500. But there is no way to relate that to another metrik e.g. custom range of http codes between >= 200 and < 400 as 'g...
about 2 months ago in Instana / Enterprise Applications 2 Needs more information

bring in ANY GCP metric into Instana

Want the ability to bring in ANY GCP metric into Instana. Some of our competitors have solutions that have out of the box dashboards for specific GCP services. But, they also provide the ability to specify a configuration to bring in metrics from ...
4 months ago in Instana / Sensor 2 Future consideration

verify IIS credential on agent setup or show missing credential in agent log

When Installing and running agent on a Windows host hosting IIS, the agent seems read the content of the application pool and site with the local admin right.if local admin rights is removed from the user that run the app pool Instana wont be able...
4 months ago in Instana / Sensor 0 Under review

Generic Configuration-based SDK

Generic Configuration-based SDK When working with the Configuration-based SDK, customer wants to use each class-method pair under "sdk.targets" in a generic way, not individually. To summarize, Instead of this one: sdk: targets: - match: type: cla...
8 months ago in Instana / Extend Capabilities 3 Planned for future release

Add support for Azure Microsoft Dynamics 365 to Instana

Add observability capability to Dynamics 365 to extend visibility into workloads running on that Azure service. That would enable an end-to-end traces accessing that service. That capability would be useful for all customers that are using Dynamic...
about 1 year ago in Instana / Azure / Sensor 0 Future consideration

SLO based alerts

We think it should be possible to create alerts based on defined SLIs and SLOs. Currently, it's not possible to alert if something is consuming an available error budget too fast over a certain time or that we consumed the error budget already com...
over 2 years ago in Instana / Alert / SLO/SLI (STAN) 0

Correlation Between AWS RDS and AWS Lambda Native Tracing

We propose an enhancement in Instana to improve the correlation between AWS RDS databases and services detected by AWS Lambda Native Tracing. Currently, we experience a lack of visibility and correlation between these components, which impacts our...
2 months ago in Instana / Tracing 0 Under review

Attach event payload to resolve events for PagerDuty integration

Events sent via the Instana-PagerDuty integration can be routed to different alerting services inside PagerDuty based on rules triggered by certain payloads. Instana alert trigger events include this payload but resolve events do not. This means t...
2 months ago in Instana / Integrations 0 Submitted

Add authentication capabilities to eum-acceptor download GeoLite2 DB from sources with authentication.

Dear colleagues, Our customer was trying to associate EUM transaction with geographical location while using self-hosted Instana. We can specify the location of GeoLite2 DB by setting the location in Instana core manifest, but there is no way to s...
2 months ago in Instana / Real User Monitoring 0 Under review