Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Configure maintenance flyouts
User interface settings include the option “Show maintenance notes”. How can I as onprem-backend administrator configure and switch on such flyouts to inform my users about upcoming maintenance?

All ideas

Showing 3665

Allow insert limit in Park override

Today if a user override a parket VM, they can choose between a end date or a number of hours. But someone with bad intentions can override for 1 year or 999 hours for instance. The admin should have a way to put limit on each override, like 2 hou...
2 months ago in IBM Turbonomic ARM / UI & User Experience 0 Future consideration

Smart Alert - grouping/summary/templates

A function of other APMs that I've used is the concepts of summaries and group alert copy or alert templates. Summaries - In cases, when memory, CPU and or filesystems alert they do so together which is a single event. With a summary structure, wh...
2 months ago in Instana / Infrastructure 1 Functionality already exists

Smart alerts should have a severity placeholder

With build " 1.282.1064" the smart alerts got a very useful ability to have warning and critical thresholds defined on a single smart alert. This was a welcomed change and reduce our planned alert set by half. However, we were also expecting to be...
2 months ago in Instana / Infrastructure 1

Expansions of Infrastructure Smart Alerts

Decouple the smart alert title with the subject of the resulting email. Currently with the title and subject line being the same, the display for smart alerts shows the placeholders which have no real meaning in the context of smart alert listings.
2 months ago in Instana / Infrastructure 2 Functionality already exists

Insana Alerting - JS errors based on error rate while using multiple filter conditions

We are trying to do alerting for JS errors based on error rate as the metric is available within alerting scope, but it's not working as expected. When applying different filter expressions within our JS alerting scope, the error rate metric isn't...
2 months ago in Instana / Alert 1 Needs more information

ASM Topology Dashboard Favorites Inner Status Coloring

When I create a topology dashboard template and set it as favorite, a nice bubble icon with status colors appear for topology drill down. The pie chart around the icon is actually showing status severity of all topology related objects. Which basi...
over 3 years ago in IBM Cloud Pak for AIOps 1 Planned for future release

Keep billing data statistics based on the Data Retention policy (currently, it can only display up to 30 days at maximum)

Currently, Cost Breakdown Charts can display data from the last 7 or 30 dayshttps://www.ibm.com/docs/en/tarm/8.11.0?topic=types-cost-breakdown-charts On the other hand, according to the Data Retention Policy as whole turbonomic, it is possible to ...

Hot-Plugging Memory and CPUs on Virtual Machines (AHV)

Currently a reboot is required on virtual machines running on AHV to hot add resources. Nutanix allows hot add capabilities for CPU and Memory without a reboot natively. Turbonomic should be able to leverage the API and do the same without requiri...
6 months ago in IBM Turbonomic ARM / General/Other 0 Planned for future release

Need periodic reports in different formats

Dear Colleagues, we have a constant demand from our customers regarding reporting capabilities. Please consider creating additional sharing option for custom dashboards. Something like periodic report, that generates a PDF (CSV, XLS, Plain text) f...
6 months ago in Instana / Application perspectives 0 Future consideration

More Elastic Scaling: Remove hardcoded restrictions on maximum observation period

For those customers that want to unleash Turbonomic to unlock elasticity in the cloud, we use the percentile and observation settings to help influence Turbo's decision making. However, it appears there are hardcoded limits to the minimum/maximum ...
about 1 year ago in IBM Turbonomic ARM 0 Planned for future release