Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Configure maintenance flyouts
User interface settings include the option “Show maintenance notes”. How can I as onprem-backend administrator configure and switch on such flyouts to inform my users about upcoming maintenance?

Instana

Showing 1200

Flutter Multiple Backend Configuration

Currently, Instana flutter agent (and mobile app in general) only support sending monitoring data to a single backend. For customer with high availability active-active setup, sending data to 1 backend will definitely impact the data availability....
2 months ago in Instana / Real User Monitoring 0 Submitted

Instana to monitor IBM DataPower Gateway Physical appliance to do end-to-end observability solution for IBM API solution.

My Clients in Thailand have applications expose service to consumers by API and using IBM solution that inclide [1] IBM DataPower Gateway  Physical appliance [2] APIConnect on CP4I . They plan to use Instana to do end-to-end observability but now...
6 months ago in Instana / DataPower 1 Not under consideration

Azure Application Insights monitoring

Support for collecting metrics, traces and logs from Azure Application InSight. This would enable insight into SaaS applications.
5 months ago in Instana / Azure / Sensor 1 Planned for future release

Smart Alert - grouping/summary/templates

A function of other APMs that I've used is the concepts of summaries and group alert copy or alert templates. Summaries - In cases, when memory, CPU and or filesystems alert they do so together which is a single event. With a summary structure, wh...
23 days ago in Instana / Infrastructure 0 Submitted

Smart alerts should have a severity placeholder

With build " 1.282.1064" the smart alerts got a very useful ability to have warning and critical thresholds defined on a single smart alert. This was a welcomed change and reduce our planned alert set by half. However, we were also expecting to be...
23 days ago in Instana / Infrastructure 0 Submitted

Expansions of Infrastructure Smart Alerts

Decouple the smart alert title with the subject of the resulting email. Currently with the title and subject line being the same, the display for smart alerts shows the placeholders which have no real meaning in the context of smart alert listings.
23 days ago in Instana / Infrastructure 0 Submitted

Insana Alerting - JS errors based on error rate while using multiple filter conditions

We are trying to do alerting for JS errors based on error rate as the metric is available within alerting scope, but it's not working as expected. When applying different filter expressions within our JS alerting scope, the error rate metric isn't...
23 days ago in Instana / Alert 0 Submitted

JBoss 7.4.6 and WildFly Full 23.0.2.Final (WildFly Core 15.0.1.Final) support

Currently the following Java stack is not supported: WildFly Full 23.0.2.Final (WildFly Core 15.0.1.Final) JBoss EAP 7.4.6.GA As a result some endpoints are represented in not human-friendly hexadecimal form (e.g. e49219dd-8f34-4470-bc32-da462e4d6...
about 1 month ago in Instana / Java 0 Submitted

Submit complex IBM ELM JVM Mbeans or string based Mbeans as events or logs to Instana

IBM Engineering lifecycle management platform (ELM or also known as Jazz platform) is a widely used Requirements management or Application lifecycle management platform in the industry. It is based on IBM Websphere application Server and the liber...
2 months ago in Instana / Agent 0 Under review

Extending Instana JAVA-Sensor to collect additional metrics from IBM ELM JVM's

IBM Engineering lifecycle management platform (ELM or also known as Jazz platform) is a widely used Requirements management or Application lifecycle management platform in the industry. It is based on IBM Websphere application Server and the liber...
2 months ago in Instana / Agent 0 Under review