Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

My subscriptions: Instana

Showing 12

Flexibility to adjust the adaptive threshold to take a longer time-frame into account to avoid sharp changes to the adaptive threshold.

The customer requests more flexibility in the method of determining the adaptive threshold and allow the adaptive threshold to take a longer time-frame into account when modifying the threshold. In the cases experiences by the customer, when a tre...
5 months ago in Instana / Alert 3 Is a defect

JBoss 7.4.6 and WildFly Full 23.0.2.Final (WildFly Core 15.0.1.Final) support

Currently the following Java stack is not supported: WildFly Full 23.0.2.Final (WildFly Core 15.0.1.Final) JBoss EAP 7.4.6.GA As a result some endpoints are represented in not human-friendly hexadecimal form (e.g. e49219dd-8f34-4470-bc32-da462e4d6...
3 months ago in Instana / Java 1 Is a defect

Create API to purge data for a given agent/host

The agent on our Instana backend host got switched from Infrastructure mode to APM mode and cause the system to consume more than 100 GB of data over the course of just a few days. We switched it back off, but now we are stuck with all this data w...
almost 2 years ago in Instana / Self Hosted 4 Is a defect

AzureApp service

As we could see, your Azure App Services are discovered and we are able to see the metrics. You were missing the tracing so we did the troubleshooting for that. We could see that our InstanaProfiler is in place and after checking the logs, there a...
9 months ago in Instana / Self Hosted 1 Is a defect

Instana Mode set as IQM not be defaulted back to APM on machine reboot

We were doing our monthly patching on mongo machines where the Instana mode was showing as IQM in GUI of Instana and on the machine console as well.[ec2-user@mng3~]$ sudo cat /opt/instana/agent/etc/instana/com.instana.agent.main.config.Agent.cfg# ...
almost 2 years ago in Instana / Agent 0 Is a defect

Improve i-Series agent performance

Using Instana to monitor IBM i-Series system is not being to successful due to the agent being to heavy on the CPU usage of the i-Series. We need an improvement on the performance of the agent, which currently is to heavy and clients are not willi...
almost 2 years ago in Instana / IBM i / Sensor 1 Is a defect

Allow configuration of the "No responses received for > 10 seconds" value

Request to allow the configuration of the default 10 second value when an agent is disconnected from the SAAS instana Dashboard. We have experienced on occasion network convergences or brief unexpected outages at which point our Instana's Agents l...
over 1 year ago in Instana / Agent 2 Is a defect

Trigger alerts depending on several events linked with an AND

We currently use offline events in a static JBoss environment to trigger an incident at the control centre. Unfortunately, agent updates, for example, lead to the agents being switched offline in extreme cases. It would be very helpful if offline ...
over 1 year ago in Instana / Agent / Alert 3 Is a defect

Grace Period "None" Option

I set up an event to detect JVM Offline incidents and set it as a critical condition, when this is detected an alert is raised and sent to our Teams channel for my team to react to. Following a critical alert we get a grace period alert which is n...
over 1 year ago in Instana / Alert 2 Is a defect

Support of Springboot newer versions (from 2.7.0)

Hello, We recently updated our springboot framework to 2.7.0 and found out that we lost a certain amount of spans and custom tags after this upgrade. Can you plan to support at least this version of springboot shortly ? Kind Regards, Quentin
almost 2 years ago in Instana / Java 1 Is a defect