Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Configure maintenance flyouts
User interface settings include the option “Show maintenance notes”. How can I as onprem-backend administrator configure and switch on such flyouts to inform my users about upcoming maintenance?

All ideas

Showing 4156 of 4156

We need the Event for ACE Integration Node offline and should be able to generate separate Alerts for PROD and NON-PROD.

We tried with SystemRule "Offline Event Detection" and Dynamic Focus Query "entity.selfType: IntegrationNode". This is generating Event/Alert when any of the Integration Nodes is down. But we are looking for separate Event/Alert for PROD and NON-P...
5 months ago in Instana / Sensor 0 Submitted

Synthetic Alerts

Alerts that are defined within SevOne are restricted to the trigger conditions within that policy. The idea here is to be able to define synthetic alerts based on the presence or count of another alert (or multiple). The main requirement is for al...
5 months ago in SevOne / Network Management System (NMS) 1 Future consideration

Flexible data storage requirements for appliances

The data storage requirements for the PAS and DNC are rigid at present. While a customer may not have a requirement to archive metric and flow data for a period of 1 year, the ova files are pre configured with a set storage requirement. The storag...
9 months ago in SevOne / Network Management System (NMS) 0 Future consideration

See Time Dimensions vertically along with other dimensions and values in a table

I create reports in TBM and would like to be able to build out reports with a Months column, a YearToDate metric column, and any additional dimensions and metrics.  To display the monthly values vertically, we would need the capability of tre...
12 months ago in Apptio / TBM Studio - Data/Model Studio 0 Future consideration

Keep billing data statistics based on the Data Retention policy (currently, it can only display up to 30 days at maximum)

Currently, Cost Breakdown Charts can display data from the last 7 or 30 dayshttps://www.ibm.com/docs/en/tarm/8.11.0?topic=types-cost-breakdown-charts On the other hand, according to the Data Retention Policy as whole turbonomic, it is possible to ...

Use custom headers to map dependencies

At Capitec, we have a custom header which we are already including in our transactions: x-capitec-correlation-id. We have enabled our agents to capture this header and we are making us of it in the transactions analytics section where we set a fil...
7 months ago in Instana / Backend Enablement 1 Functionality already exists

Large resource statuses to load a small subset of status event and allow user to page between them to improve performance. So if a resource has more than 30 (user configurable) statuses against it, it would load the first 30 and provide an option to page between additional pages containing the next 30 etc.

Currently if a resource has lots of statuses against them then opening the status view can sit there for ages before loading or giving up and throwing an error. By limiting the number shown and allowing the user to step through additional status r...
9 months ago in IBM Cloud Pak for AIOps 0 Future consideration

Ideas for more consumable actions

After initial deployment, it may take many Turbonomic actions to bring the existing environment to a more desired state. As a new user to Turbonomic it can be hard to digest and consume those actions and understand where to start. Some ideas to he...
over 2 years ago in IBM Turbonomic ARM 1 Future consideration

Provision to export the topology Data into Excel from Topology Viewer page.

Topology Viewer ASM page has options to export the topology to PNG, SVG Format. Need an option to export the topology to Excel.
9 months ago in IBM Cloud Pak for AIOps 0 Planned for future release

Add support for Azure Microsoft Dynamics 365 to Instana

Add observability capability to Dynamics 365 to extend visibility into workloads running on that Azure service. That would enable an end-to-end traces accessing that service. That capability would be useful for all customers that are using Dynamic...
over 1 year ago in Instana / Azure / Sensor 0 Future consideration