Skip to Main Content
Cloud Management and AIOps


This is an IBM Automation portal for Cloud Management, Technology Cost Management, Network Automation and AIOps products. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).

Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.

Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Configure maintenance flyouts
User interface settings include the option “Show maintenance notes”. How can I as onprem-backend administrator configure and switch on such flyouts to inform my users about upcoming maintenance?

All ideas

Showing 4363 of 4363

Log window output enhancements

Would find it very convenient to be able to close all non-executing (stopped) log tabs with one button. Right now I have to click many times to close all the older tabs. e.g., "close all" Notes: Shane offered a few different ways to the user: Clos...
5 months ago in Rapid Network Automation 2 Future consideration

Add conditional breakpoints (eval functions)

Would be good to add possibility for conditional breakpoints, where you say "stop here if x == false". Perhaps a breakpoint block with an eval function that is only enabled when debug. Perhaps looking like an "if block". The "breakpoint" block wou...
5 months ago in Rapid Network Automation 1 Future consideration

Improve try catch to reduce number of required blocks.

Currenty when using try/catch blocks, you almost always need 4 blocks. "Try"... "block to execute" ... "catch" ... "if block to check exception". I think the improvement might be to merge the catch/if by making the catch block have fields to simul...
5 months ago in Rapid Network Automation 1 Functionality already exists

Allow for admin or users to hide integrations for users by default

Add feature request to hide uncommon or unused integrations from the left navigation bar. Generally an organization will probably only use a handful of integrations. Perhaps have an option to unhide temporarily.
5 months ago in Rapid Network Automation 2 Functionality already exists

Allow step into when debugging workflow

Currenty when debugging workflows, you can resume, start over, stop and step. The possibility for stepping into another function is missing. This feature is key to allow workflow reuse.
5 months ago in Rapid Network Automation 2 Future consideration

Mute or Silent specific service alert to exclude specific Node/Cluster from the filter

Mute/Silent alerts for Particular node or cluster which is making lot of noise. Please refer case ID TS016989752 for the same.
5 months ago in Instana / Alert 1 Functionality already exists

Centralize Executed Actions between Turbonomic instances

If we want HA for any of the features that Turbonomic provides, our only option is to set up some sort of hot-warm configuration. With this configuration, actions are generated and performed locally only. If failovers have occurred in the past, it...
5 months ago in IBM Turbonomic ARM / APM & Applications & Databases 1 Future consideration

Add functionality to log hot-to-warm failover and/or make more visible when actions were disabled

Failing over is a manual process, and changes to what instance is running "hot" and what instance is running "warm" are not clearly evident from the charts. It would be very beneficial to not only be able to see, transposed onto all historical gra...
5 months ago in IBM Turbonomic ARM / UI & User Experience 1 Future consideration

Target health check “TEST button”

Hi Team :-) In Legacy PMC product we have a TEST button which can check the health of the Target. I think it would be amazing to have the same in Turbonomic Here below how it works: After you run TEST, and let's say, there is any issue with List r...
5 months ago in IBM Turbonomic ARM / Target Support 3 Future consideration

Enrich transactions in Instana with Network Flow metadata from NPM

Customers are looking for Instana to be their Single pane of glass for observability. A common question is how about the network, what if the problem is there? Our partner Rebendo and customer TINE has a suggestion that customers who use an NPM li...
5 months ago in Instana / Extend Capabilities 0 Future consideration